ITAC Assessment: MZ0090
ITAC logo
ITAC Assessment: MZ0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Butyl rubber industrial compunds
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 40,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,125
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,185 393,960
kWh
Electricity Demand $6,484 2,503
kW-mo/yr
Natural Gas $26,606 3,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $185 $220 $185
2,496
kWh
- -
02 2.7135: Install occupancy sensors $24 $110 $24
324
kWh
- -
03 2.7492: Use proper thickness of insulation on building envelope $296 $360 - - $296
-
MMBtu
04 2.4133: Use most efficient type of electric motors $403 $1,159 $385
5,189
kWh
$19
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $2,567 $23,196 $2,148
28,983
kWh
$420
-
kW-mo/yr
-
06 2.4112: Install soft-start to eliminate nuisance trips $3,072 $12,000 - $3,072
-
kW-mo/yr
-
TOTAL RECOMMENDED $6,547 $37,045 $2,741
36,992
kWh
$3,510
-
kW-mo/yr
$296
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs