ITAC Assessment: WV0592
ITAC logo
ITAC Assessment: WV0592
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Vacuum Devices
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 306
Plant Area 230,000
ft2
Annual Production 200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,200 1,442,100
kWh
Electricity Demand $11,105 3,952
kW-mo/yr
Electricity Fees $12,932 -
Natural Gas $23,292 3,118
MMBtu
Waste Disposal Costs
Water Usage $9,918 694
Tgal
Water Disposal $7,836 694
Tgal
TOTAL YEARLY COSTS $161,283
RECOMMENDED SAVINGS* $30,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.7241: Install outside air damper / economizer on hvac unit $8,201 $9,500 $8,201
122,951
kWh
- - - - -
02 3.5131: Recycle white water $6,078 $6,252 $(-608.0)
(-9,115)
kWh
- - $1,984
-
Tgal
$4,702
-
Tgal
-
03 2.7135: Install occupancy sensors $4,217 $9,054 $3,787
56,782
kWh
$430
-
kW-mo/yr
- - - -
04 3.4151: Minimize water usage $3,145 $2,100 - - - $2,597
-
Tgal
$2,052
-
Tgal
$(-1,504.0)
05 2.3191: Use demand controller or load shedder $1,832 $4,720 - $1,832
-
kW-mo/yr
- - - -
06 2.6232: Install set-back timers $1,823 $222 - - $1,823
-
MMBtu
- - -
07 2.4224: Upgrade controls on compressors $1,361 $3,757 $1,361
20,407
kWh
- - - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $964 $3,240 $891
13,351
kWh
$73
-
kW-mo/yr
- - - -
09 2.4322: Use or replace with energy efficient substitutes $829 $3,850 $767
11,495
kWh
$62
-
kW-mo/yr
- - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $723 $1,312 $684
10,260
kWh
$39
-
kW-mo/yr
- - - -
11 2.4231: Reduce the pressure of compressed air to the minimum required $397 $36 $374
5,604
kWh
$23
-
kW-mo/yr
- - - -
12 2.4151: Develop a repair/replace policy $372 $303 $480
7,195
kWh
- - - - $(-108.0)
13 2.2511: Insulate bare equipment $157 $742 - - $157
-
MMBtu
- - -
14 2.1233: Analyze flue gas for proper air/fuel ratio $47 $250 - - $83
-
MMBtu
- - $(-36.0)
TOTAL RECOMMENDED $30,146 $45,338 $15,937
238,930
kWh
$2,459
-
kW-mo/yr
$2,063
-
MMBtu
$4,581
-
Tgal
$6,754
-
Tgal
$(-1,648.0)
TOTAL IMPLEMENTED $19,999 $26,509 $14,417
216,143
kWh
$565
-
kW-mo/yr
$1,980
-
MMBtu
$2,597
-
Tgal
$2,052
-
Tgal
$(-1,612.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs