Assessment Year | 2000 |
---|---|
Principal Product | Paint Related Products |
NAICS |
n/a
|
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 122 |
Plant Area |
120,000
ft2
|
Annual Production | 10,000
Tgal
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $75,018 | 2,534,584 |
kWh
|
$0.030 |
Electricity Demand | $117,464 | 7,128 |
kW-mo/yr
|
$16.48 |
Electricity Fees | $(-1,125.0) | - |
|
- |
Natural Gas | $239,498 | 50,840 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $90,199 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,274 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $428 | $500 |
$314
4,103
kWh
|
$114
-
kW-mo/yr
|
- | - | - | |
02 | 2.7122: Disconnect ballasts | $1,786 | - |
$1,786
60,375
kWh
|
- | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,860 | $48,600 |
$4,960
167,644
kWh
|
$5,900
-
kW-mo/yr
|
- | - | - | |
04 | 2.1241: Reduce excessive boiler blowdown | $1,813 | $4,430 | - | - |
$1,813
-
MMBtu
|
- | - | |
05 | 2.2113: Repair or replace steam traps | $9,420 | $880 | - | - |
$9,420
-
MMBtu
|
- | - | |
06 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $7,640 | $6,500 | - | - |
$7,640
-
MMBtu
|
- | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $19,310 | $7,000 | - | - | - |
$19,310
-
Tgal
|
- | |
08 | 4.632: Change operating conditions | $38,942 | $20,000 | - | - | - | - | $38,942 | |
TOTAL RECOMMENDED | $90,199 | $87,910 |
$7,060
232,122
kWh
|
$6,014
-
kW-mo/yr
|
$18,873
-
MMBtu
|
$19,310
-
Tgal
|
$38,942 | ||
TOTAL IMPLEMENTED | $19,274 | $7,880 |
$2,100
64,478
kWh
|
$114
-
kW-mo/yr
|
$17,060
-
MMBtu
|
- | - | ||