ITAC Assessment: UM0156
ITAC logo
ITAC Assessment: UM0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Paint Related Products
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 122
Plant Area 120,000
ft2
Annual Production 10,000
Tgal
Production Hrs. Annual 4,680
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,018 2,534,584
kWh
Electricity Demand $117,464 7,128
kW-mo/yr
Electricity Fees $(-1,125.0) -
Natural Gas $239,498 50,840
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,274

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $428 $500 $314
4,103
kWh
$114
-
kW-mo/yr
- - -
02 2.7122: Disconnect ballasts $1,786 - $1,786
60,375
kWh
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,860 $48,600 $4,960
167,644
kWh
$5,900
-
kW-mo/yr
- - -
04 2.1241: Reduce excessive boiler blowdown $1,813 $4,430 - - $1,813
-
MMBtu
- -
05 2.2113: Repair or replace steam traps $9,420 $880 - - $9,420
-
MMBtu
- -
06 2.1243: Use heat from boiler blowdown to preheat boiler feed water $7,640 $6,500 - - $7,640
-
MMBtu
- -
07 3.4116: Meter recycled water (to reduce sewer charges) $19,310 $7,000 - - - $19,310
-
Tgal
-
08 4.632: Change operating conditions $38,942 $20,000 - - - - $38,942
TOTAL RECOMMENDED $90,199 $87,910 $7,060
232,122
kWh
$6,014
-
kW-mo/yr
$18,873
-
MMBtu
$19,310
-
Tgal
$38,942
TOTAL IMPLEMENTED $19,274 $7,880 $2,100
64,478
kWh
$114
-
kW-mo/yr
$17,060
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs