| Assessment Year | 1991 |
|---|---|
| Principal Product | COPPER WIRE |
| NAICS |
n/a
|
| SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
| Sales Range | $100 M to 500M |
| # of Employees | 331 |
| Plant Area |
n/a
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Rhode Island |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $984,731 | 11,110,786 |
kWh
|
$0.089 |
| Natural Gas | $55,820 | 8,368 |
MMBtu
|
$6.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $70,665 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $70,665 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $30,047 | $51,400 |
$30,047
339,097
kWh
|
- | |
| 02 | 2.3191: Use demand controller or load shedder | $14,649 | $15,470 | - |
$14,649
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $7,973 | $724 |
$7,973
89,977
kWh
|
- | |
| 04 | 2.2136: Install / repair insulation on steam lines | $1,981 | $726 | - |
$1,981
-
MMBtu
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $753 | - |
$753
8,499
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,262 | $15,300 |
$15,262
171,454
kWh
|
- | |
| TOTAL RECOMMENDED | $70,665 | $83,620 |
$54,035
609,027
kWh
|
$16,630
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $70,665 | $83,620 |
$54,035
609,027
kWh
|
$16,630
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs