ITAC Assessment: BD0217
ITAC logo
ITAC Assessment: BD0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Modular Homes
NAICS
n/a
SIC 3219:
Sales Range $5
M
to 10
M
# of Employees 66
Plant Area 54,000
ft2
Annual Production 250
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,275 333,853
kWh
Electricity Demand $3,668 1,465
kW-mo/yr
Natural Gas $17,155 17,050
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7231: Use radiant heater for spot heating $3,511 $8,000 - - $3,511
-
MMBtu
- - - -
02 2.2437: Recover waste heat from equipment $1,250 $1,500 - - $1,250
-
MMBtu
- - - -
03 2.7134: Use photocell controls $452 $1,000 - $370
-
kW-mo/yr
- - $33 $49 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $345 $700 $251
22
kWh
$94
-
kW-mo/yr
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $104 - $76
7
kWh
$28
-
kW-mo/yr
- - - - -
06 3.4151: Minimize water usage $334 $200 - - - $334
-
Tgal
- - -
07 2.8113: Purchase gas directly from a contract gas supplier $7,522 $2,000 - - - - - $7,522 -
08 4.454: Modify startup/shutdown times $3,668 $4,000 - $3,668
-
kW-mo/yr
- - - - -
09 4.447: Automate payroll system $2,945 $2,495 - - - - - - $2,945
TOTAL RECOMMENDED $20,131 $19,895 $327
29
kWh
$4,160
-
kW-mo/yr
$4,761
-
MMBtu
$334
-
Tgal
$33 $7,571 $2,945
TOTAL IMPLEMENTED $1,929 $2,400 $251
22
kWh
$94
-
kW-mo/yr
$1,250
-
MMBtu
$334
-
Tgal
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs