ITAC Assessment: TN0348
ITAC logo
ITAC Assessment: TN0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product IRON CASTINGS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 8,400,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $529,994 8,475,967
kWh
Natural Gas $114,430 23,370
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,788

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $36,025 $30,400 - $36,025
-
MMBtu
02 2.1135: Repair furnaces and oven doors so that they seal efficiently $29,414 $3,200 $29,414
466,882
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $15,528 - $15,528
246,483
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,484 - $11,484
182,298
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,890 $720 $5,890
93,494
kWh
-
TOTAL RECOMMENDED $98,341 $34,320 $62,316
989,157
kWh
$36,025
-
MMBtu
TOTAL IMPLEMENTED $46,788 $3,920 $46,788
742,674
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs