Assessment Year | 1997 |
---|---|
Principal Product | Plating |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | n/a |
# of Employees | 66 |
Plant Area |
56,898
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,112
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,365 | 2,576,788 |
kWh
|
$0.049 |
Electricity Demand | $96,168 | 5,796 |
kW-mo/yr
|
$16.59 |
Natural Gas | $138,984 | 31,096 |
MMBtu
|
$4.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $381,869 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,065 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Raw Material Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.4111: Use closed cycle process to minimize waste water production | $347,702 | $505,000 | - | - | - |
$84,300
-
lb
|
- | $182,321 |
$81,081
-
Tgal
|
|
02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $17,497 | $92,676 |
$85,388
2,589,977
kWh
|
$67,536
-
kW-mo/yr
|
$(-42,751.0)
-
MMBtu
|
- | $(-92,676.0) | - | - | |
03 | 2.2514: Cover open tanks | $15,677 | $6,578 | - | - |
$15,677
-
MMBtu
|
- | - | - | - | |
04 | 2.2511: Insulate bare equipment | $605 | $970 |
$17
586
kWh
|
- |
$588
-
MMBtu
|
- | - | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $388 | - |
$388
14,361
kWh
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $381,869 | $605,224 |
$85,793
2,604,924
kWh
|
$67,536
-
kW-mo/yr
|
$(-26,486.0)
-
MMBtu
|
$84,300
-
lb
|
$(-92,676.0) | $182,321 |
$81,081
-
Tgal
|
||
TOTAL IMPLEMENTED | $16,065 | $6,578 |
$388
14,361
kWh
|
- |
$15,677
-
MMBtu
|
- | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs