ITAC Assessment: MA0407
ITAC logo
ITAC Assessment: MA0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Textile goods
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 30,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 5,400
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,472 1,468,054
kWh
Electricity Demand $66,153 6,680
kW-mo/yr
Fuel Oil #2 $5,554 649
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,613

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,744 $16,729 $4,640
72,685
kWh
$104
-
kW-mo/yr
-
02 4.652: Replace existing equipment with more suitable substitutes $5,468 $100 - - $5,468
03 2.4221: Install compressor air intakes in coolest locations $145 $52 $145
2,345
kWh
- -
TOTAL RECOMMENDED $10,357 $16,881 $4,785
75,030
kWh
$104
-
kW-mo/yr
$5,468
TOTAL IMPLEMENTED $5,613 $152 $145
2,345
kWh
- $5,468
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs