ITAC Assessment: WV0584
ITAC logo
ITAC Assessment: WV0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Open-die Forged Products
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $100
M
to 500
M
# of Employees 375
Plant Area 280,000
ft2
Annual Production 78,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $928,779 15,050,682
kWh
Electricity Fees $0.1 -
Natural Gas $3,933,605 1,207,283
MMBtu
Waste Disposal Costs
Water Usage $211,528 25,845
Tgal
Water Disposal $194,167 25,845
Tgal
TOTAL YEARLY COSTS $5,268,079
RECOMMENDED SAVINGS* $722,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,558

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $534,947 $542,300 $(-12,702.0)
(-205,875)
kWh
$547,649
-
MMBtu
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $72,031 $169,200 $72,031
1,167,445
kWh
- - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $44,593 $129,500 - $44,646
-
MMBtu
- - $(-53.0)
04 3.5131: Recycle white water $26,110 $17,500 $(-806.0)
(-13,070)
kWh
- $14,033
-
Tgal
$12,883
-
Tgal
-
05 2.2511: Insulate bare equipment $18,530 $6,283 - $18,530
-
MMBtu
- - -
06 2.4151: Develop a repair/replace policy $7,129 $675 $7,409
120,079
kWh
- - - $(-280.0)
07 2.4157: Establish a predictive maintenance program $5,503 $1,000 $7,903
128,085
kWh
- - - $(-2,400.0)
08 2.4224: Upgrade controls on compressors $5,427 $8,500 $5,427
87,965
kWh
- - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,899 $510 $3,899
63,193
kWh
- - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $3,028 $5,443 $3,028
49,080
kWh
- - - -
11 2.4231: Reduce the pressure of compressed air to the minimum required $876 $358 $876
14,196
kWh
- - - -
TOTAL RECOMMENDED $722,073 $881,269 $87,065
1,411,098
kWh
$610,825
-
MMBtu
$14,033
-
Tgal
$12,883
-
Tgal
$(-2,733.0)
TOTAL IMPLEMENTED $83,558 $143,769 $23,115
374,633
kWh
$63,176
-
MMBtu
- - $(-2,733.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs