ITAC Assessment: LE0143
ITAC logo
ITAC Assessment: LE0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Marking Devices
NAICS
n/a
SIC 3953: Marking Devices
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 86,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,127 884,400
kWh
Electricity Demand $30,341 7,346
kW-mo/yr
Fuel Oil #2 $20,271 3,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,454 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,079

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,545 $2,500 - $4,545
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $1,009 $1,000 $462
6,506
kWh
$547
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,286 - $1,157
16,293
kWh
$1,129
-
kW-mo/yr
-
04 2.2136: Install / repair insulation on steam lines $166 $195 - - $166
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $655 $6,500 - - $655
-
MMBtu
06 2.4314: Use synthetic lubricant $793 $400 $346
4,880
kWh
$447
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,454 $10,595 $1,965
27,679
kWh
$6,668
-
kW-mo/yr
$821
-
MMBtu
TOTAL IMPLEMENTED $3,079 $400 $1,503
21,173
kWh
$1,576
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs