ITAC Assessment: WV0464
ITAC logo
ITAC Assessment: WV0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product pressure sensitive films
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 150,000
ft2
Annual Production 75,000,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,252,832 17,932,100
kWh
Electricity Demand $238,938 36,912
kW-mo/yr
Natural Gas $162,804 35,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,739 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,978

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.6231: Utilize controls to operate equipment only when needed $38,155 $6,768 $8,540
122,171
kWh
- $29,615
-
MMBtu
-
02 2.4157: Establish a predictive maintenance program $17,893 $1,000 $17,263
246,973
kWh
$2,387
-
kW-mo/yr
- $(-1,757.0)
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,493 $17,640 $12,493
178,726
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,702 - $4,094
58,573
kWh
$608
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $4,654 $984 $4,052
57,968
kWh
$602
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,550 $32 $2,265
32,407
kWh
$285
-
kW-mo/yr
- -
07 2.4151: Develop a repair/replace policy $1,256 $1,068 $1,439
20,581
kWh
$201
-
kW-mo/yr
- $(-384.0)
08 2.2414: Use waste heat from hot flue gases to preheat $987 $2,640 $(-206.0)
(-2,940)
kWh
$(-32.0)
-
kW-mo/yr
$1,225
-
MMBtu
-
09 2.4226: Use / purchase optimum sized compressor $935 $3,500 $864
12,374
kWh
$71
-
kW-mo/yr
- -
10 2.7261: Install timers and/or thermostats $791 $1,320 - - $791
-
MMBtu
-
11 2.1233: Analyze flue gas for proper air/fuel ratio $323 $500 - - $371
-
MMBtu
$(-48.0)
TOTAL RECOMMENDED $84,739 $35,452 $50,804
726,833
kWh
$4,122
-
kW-mo/yr
$32,002
-
MMBtu
$(-2,189.0)
TOTAL IMPLEMENTED $25,978 $20,224 $24,343
348,255
kWh
$1,696
-
kW-mo/yr
$371
-
MMBtu
$(-432.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs