ITAC Assessment: UM0337
ITAC logo
ITAC Assessment: UM0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product automotive headliner and overhead console assemblies
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 132
Plant Area 163,000
ft2
Annual Production 932,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,263 1,256,440
kWh
Electricity Fees $8,151 -
Natural Gas $58,218 6,176
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $16,708 $8,050 $781
(-26)
kWh
$15,927
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $8,515 $240 - $8,515
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $3,264 $990 $3,264
31,483
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,938 $8,520 $2,938
28,335
kWh
-
05 2.6211: Conserve energy by efficient use of vending machines $1,090 $942 $1,090
10,512
kWh
-
06 2.2511: Insulate bare equipment $791 $478 $791
7,667
kWh
-
07 2.7135: Install occupancy sensors $666 $510 $666
6,426
kWh
-
TOTAL RECOMMENDED $33,972 $19,730 $9,530
84,397
kWh
$24,442
-
MMBtu
TOTAL IMPLEMENTED $9,306 $718 $791
7,667
kWh
$8,515
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs