| Assessment Year | 2008 |
|---|---|
| Principal Product | automotive headliner and overhead console assemblies |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $50 M to 100M |
| # of Employees | 132 |
| Plant Area |
163,000
ft2
|
| Annual Production | 932,000
pieces
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $130,263 | 1,256,440 |
kWh
|
$0.10 |
| Electricity Fees | $8,151 | - |
|
- |
| Natural Gas | $58,218 | 6,176 |
MMBtu
|
$9.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $33,972 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,306 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $16,708 | $8,050 |
$781
(-26)
kWh
|
$15,927
-
MMBtu
|
|
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,515 | $240 | - |
$8,515
-
MMBtu
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $3,264 | $990 |
$3,264
31,483
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,938 | $8,520 |
$2,938
28,335
kWh
|
- | |
| 05 | 2.6211: Conserve energy by efficient use of vending machines | $1,090 | $942 |
$1,090
10,512
kWh
|
- | |
| 06 | 2.2511: Insulate bare equipment | $791 | $478 |
$791
7,667
kWh
|
- | |
| 07 | 2.7135: Install occupancy sensors | $666 | $510 |
$666
6,426
kWh
|
- | |
| TOTAL RECOMMENDED | $33,972 | $19,730 |
$9,530
84,397
kWh
|
$24,442
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,306 | $718 |
$791
7,667
kWh
|
$8,515
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs