Assessment Year | 2008 |
---|---|
Principal Product | Interior Design Display Walls |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 185 |
Plant Area |
320,000
ft2
|
Annual Production | 40,000,000
units
|
Production Hrs. Annual | 4,030
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $725,123 | 7,496,141 |
kWh
|
$0.097 |
Electricity Fees | $1,520 | - |
|
- |
Natural Gas | $479,939 | 57,530 |
MMBtu
|
$8.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $344,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $144,783 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $70,581 | $24,000 | - | - |
$70,581
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $43,659 | $3,500 | - | $(-360.0) |
$44,019
-
MMBtu
|
|
03 | 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa | $53,901 | $12,000 | - | - |
$53,901
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,296 | $19,992 |
$29,296
302,860
kWh
|
- | - | |
05 | 2.6127: Maintain air filters by cleaning or replacement | $28,475 | $76,200 |
$(-6,036.0)
(-21,046)
kWh
|
- |
$34,511
-
MMBtu
|
|
06 | 2.3212: Optimize plant power factor | $25,696 | $34,550 | - | $25,696 | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $25,395 | $2,100 |
$25,395
262,537
kWh
|
- | - | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $21,259 | $25,425 | - | - |
$21,259
-
MMBtu
|
|
09 | 2.8112: Combine utility meters | $10,426 | $20,000 | - | $10,426 | - | |
10 | 2.4151: Develop a repair/replace policy | $8,516 | $1,250 |
$8,696
89,897
kWh
|
$(-180.0) | - | |
11 | 2.2531: Re-size charging openings or add movable cover or door | $7,681 | $10,660 | - | - |
$7,681
-
MMBtu
|
|
12 | 2.6232: Install set-back timers | $6,981 | $1,150 | - | - |
$6,981
-
MMBtu
|
|
13 | 2.2414: Use waste heat from hot flue gases to preheat | $4,036 | $38,700 | - | - |
$4,036
-
MMBtu
|
|
14 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,586 | - |
$3,586
37,076
kWh
|
- | - | |
15 | 2.2437: Recover waste heat from equipment | $3,545 | $2,940 | - | - |
$3,545
-
MMBtu
|
|
16 | 2.4221: Install compressor air intakes in coolest locations | $1,867 | $1,300 |
$1,867
19,302
kWh
|
- | - | |
TOTAL RECOMMENDED | $344,900 | $273,767 |
$62,804
690,626
kWh
|
$35,582 |
$246,514
-
MMBtu
|
||
TOTAL IMPLEMENTED | $144,783 | $170,077 |
$48,655
544,351
kWh
|
$25,696 |
$70,432
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |