Assessment Year | 1992 |
---|---|
Principal Product | FOLDING CARTONS |
NAICS |
n/a
|
SIC | 2657: Folding Paperboard Boxes, Including Sanitary |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
n/a
|
Annual Production | 12,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,922 | 2,889,508 |
kWh
|
$0.059 |
Natural Gas | $75,738 | 16,075 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,898 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,118 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $23,212 | $500 | - |
$23,212
-
MMBtu
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $14,993 | $30,000 |
$(-6,174.0)
(-103,751)
kWh
|
$21,167
-
MMBtu
|
- | |
03 | 2.8121: Apply for tax-free status for energy purchases | $13,842 | - |
$12,567
-
kWh
|
$1,275
-
MMBtu
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,837 | $5,451 |
$3,837
64,478
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $619 | - |
$619
10,551
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,205 | $5,344 |
$2,806
47,186
kWh
|
- | $(-601.0) | |
07 | 2.6232: Install set-back timers | $128 | $200 |
$128
2,052
kWh
|
- | - | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,876 | - |
$3,196
-
kWh
|
- | $(-320.0) | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $69 | - |
$69
1,172
kWh
|
- | - | |
10 | 2.7261: Install timers and/or thermostats | $1,790 | $800 | - |
$1,790
-
MMBtu
|
- | |
11 | 2.1123: Install automatic stack damper | $847 | $1,400 | - |
$847
-
MMBtu
|
- | |
12 | 2.6214: Shut off pilots in standby equipment | $190 | - | - |
$190
-
MMBtu
|
- | |
13 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,692 | $2,000 |
$(-78.0)
(-1,465)
kWh
|
$1,770
-
MMBtu
|
- | |
14 | 2.7447: Install vinyl strip / high speed / air curtain doors | $913 | $650 | - |
$913
-
MMBtu
|
- | |
15 | 2.4221: Install compressor air intakes in coolest locations | $685 | $740 |
$685
11,430
kWh
|
- | - | |
TOTAL RECOMMENDED | $67,898 | $47,085 |
$17,655
31,653
kWh
|
$51,164
-
MMBtu
|
$(-921.0) | ||
TOTAL IMPLEMENTED | $3,118 | $5,994 |
$2,806
47,186
kWh
|
$913
-
MMBtu
|
$(-601.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs