ITAC Assessment: WI0136
ITAC logo
ITAC Assessment: WI0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product WIRE AND CABLE
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 24,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,719 2,541,911
kWh
Natural Gas $58,305 13,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,951

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,792 $2,981 $4,792
63,892
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,714 - $7,194
95,838
kWh
- $(-480.0)
03 2.1123: Install automatic stack damper $3,416 $2,300 - $3,416
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,478 $300 - $1,478
-
MMBtu
-
05 2.7494: Install storm windows and doors $325 $195 - $325
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $226 $200 - $226
-
MMBtu
-
07 2.2511: Insulate bare equipment $1,350 $320 $1,350
18,171
kWh
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,333 - $1,333
-
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $931 $1,500 $931
12,309
kWh
- -
10 2.6231: Utilize controls to operate equipment only when needed $475 $450 $475
6,448
kWh
- -
TOTAL RECOMMENDED $21,040 $8,246 $16,075
196,658
kWh
$5,445
-
MMBtu
$(-480.0)
TOTAL IMPLEMENTED $16,951 $5,976 $11,986
159,730
kWh
$5,445
-
MMBtu
$(-480.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs