| Assessment Year | 1992 |
|---|---|
| Principal Product | WIRE AND CABLE |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 24,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $190,719 | 2,541,911 |
kWh
|
$0.075 |
| Natural Gas | $58,305 | 13,642 |
MMBtu
|
$4.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,040 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,951 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,792 | $2,981 |
$4,792
63,892
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,714 | - |
$7,194
95,838
kWh
|
- | $(-480.0) | |
| 03 | 2.1123: Install automatic stack damper | $3,416 | $2,300 | - |
$3,416
-
MMBtu
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,478 | $300 | - |
$1,478
-
MMBtu
|
- | |
| 05 | 2.7494: Install storm windows and doors | $325 | $195 | - |
$325
-
MMBtu
|
- | |
| 06 | 2.7261: Install timers and/or thermostats | $226 | $200 | - |
$226
-
MMBtu
|
- | |
| 07 | 2.2511: Insulate bare equipment | $1,350 | $320 |
$1,350
18,171
kWh
|
- | - | |
| 08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,333 | - |
$1,333
-
kWh
|
- | - | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $931 | $1,500 |
$931
12,309
kWh
|
- | - | |
| 10 | 2.6231: Utilize controls to operate equipment only when needed | $475 | $450 |
$475
6,448
kWh
|
- | - | |
| TOTAL RECOMMENDED | $21,040 | $8,246 |
$16,075
196,658
kWh
|
$5,445
-
MMBtu
|
$(-480.0) | ||
| TOTAL IMPLEMENTED | $16,951 | $5,976 |
$11,986
159,730
kWh
|
$5,445
-
MMBtu
|
$(-480.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs