ITAC Assessment: MA0738
ITAC logo
ITAC Assessment: MA0738
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Gates, valves & water control equipment
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 245,668
ft2
Annual Production 1,500
ton
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $773,160 6,902,600
kWh
Electricity Demand $68,553 17,302
kW-mo/yr
Electricity Fees $19,144 -
LPG $374,692 19,271
MMBtu
Fuel Oil #6 $347,826 18,595
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $59,139 $500 - - $59,139
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,551 $1,000 $4,181
37,331
kWh
$7,370
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,739 $11,430 $9,739
86,956
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $5,924 $3,000 $1,227
10,951
kWh
$4,697
-
MMBtu
-
05 2.2437: Recover waste heat from equipment $4,433 $8,441 - $4,433
-
MMBtu
-
06 2.2511: Insulate bare equipment $4,239 $2,000 - $4,239
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $347 $400 $347
3,095
kWh
- -
TOTAL RECOMMENDED $95,372 $26,771 $15,494
138,333
kWh
$20,739
-
MMBtu
$59,139
TOTAL IMPLEMENTED $71,037 $1,900 $4,528
40,426
kWh
$7,370
-
MMBtu
$59,139
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs