Assessment Year | 1991 |
---|---|
Principal Product | METAL GEARS |
NAICS |
n/a
|
SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
n/a
|
Annual Production | 800,000
pieces
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,060 | 364,889 |
kWh
|
$0.099 |
Natural Gas | $3,780 | 905 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,489 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,489 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,926 | $153 |
$1,926
19,637
kWh
|
- | |
02 | 2.4312: Improve lubrication practices | $712 | - |
$712
7,327
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $692 | $640 |
$692
7,034
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $604 | - |
$604
6,155
kWh
|
- | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $586 | - | - |
$586
-
MMBtu
|
|
06 | 2.7494: Install storm windows and doors | $321 | $812 | - |
$321
-
MMBtu
|
|
07 | 2.7261: Install timers and/or thermostats | $263 | $200 | - |
$263
-
MMBtu
|
|
08 | 2.6232: Install set-back timers | $180 | $200 |
$180
1,758
kWh
|
- | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $132 | $300 | - |
$132
-
MMBtu
|
|
10 | 2.2692: Use outside cold water source as a supply of cooling water | $73 | - | - |
$73
-
MMBtu
|
|
TOTAL RECOMMENDED | $5,489 | $2,305 |
$4,114
41,911
kWh
|
$1,375
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,489 | $2,305 |
$4,114
41,911
kWh
|
$1,375
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs