ITAC Assessment: IP0161
ITAC logo
ITAC Assessment: IP0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Food Bank
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 95
Plant Area 300,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 2,496
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,537 2,614,000
kWh
Electricity Demand $128,820 6,014
kW-mo/yr
Natural Gas $10,728 6,203
MMBtu
Waste Disposal Costs
Water Usage $9,213 430
Tgal
TOTAL YEARLY COSTS $266,298
RECOMMENDED SAVINGS* $9,358 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,209

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6211: Conserve energy by efficient use of vending machines $94 - $57
1,261
kWh
$37
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,573 - $1,179
26,208
kWh
$394
-
kW-mo/yr
-
03 2.7212: Install or upgrade insulation on hvac distribution systems $1,152 $88 $698
15,498
kWh
$454
-
kW-mo/yr
-
04 2.7231: Use radiant heater for spot heating $709 $1,601 - - $709
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $5,440 $13,298 $5,440
120,888
kWh
- -
06 2.7124: Make a practice of turning off lights when not needed $128 $328 $128
2,847
kWh
- -
07 2.7135: Install occupancy sensors $262 $724 $262
5,820
kWh
- -
TOTAL RECOMMENDED $9,358 $16,039 $7,764
172,522
kWh
$885
-
kW-mo/yr
$709
-
MMBtu
TOTAL IMPLEMENTED $3,209 $1,140 $2,324
51,634
kWh
$885
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs