Assessment Year | 2004 |
---|---|
Principal Product | Soft drinks in bottles and cans |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
258,000
ft2
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,460 | 9,518,400 |
kWh
|
$0.023 |
Electricity Demand | $157,644 | 22,524 |
kW-mo/yr
|
$7.00 |
Electricity Fees | $117,212 | - |
|
- |
Natural Gas | $311,638 | 53,531 |
MMBtu
|
$5.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,375 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,362 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $658 | $50 |
$414
18,096
kWh
|
$244
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,295 | $1,101 |
$2,077
90,720
kWh
|
$1,218
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $3,008 | $540 | - | - |
$3,008
-
MMBtu
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $1,524 | $1,430 |
$960
41,935
kWh
|
$564
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,060 | $3,135 |
$1,927
84,152
kWh
|
$1,133
-
kW-mo/yr
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,825 | $1,000 | - | - |
$3,825
-
MMBtu
|
- | |
07 | 3.1191: Change procedures / equipment / operating conditions | $10,005 | $75,600 | - | - |
$6,005
-
MMBtu
|
$4,000 | |
TOTAL RECOMMENDED | $25,375 | $82,856 |
$5,379
234,903
kWh
|
$3,159
-
kW-mo/yr
|
$12,838
-
MMBtu
|
$4,000 | ||
TOTAL IMPLEMENTED | $12,362 | $6,716 |
$5,379
234,903
kWh
|
$3,159
-
kW-mo/yr
|
$3,825
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs