Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Frozen vegetables
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 40,000
ft2
Annual Production 50,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $722,988 17,764,740
kWh
Electricity Demand $273,419 39,060
kW-mo/yr
Natural Gas $168,036 36,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1116: Improve combustion control capability $51,027 $70,000 - - $51,027
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $43,997 $26,825 $39,556
694,777
kWh
$4,441
-
kW-mo/yr
-
03 2.4323: Use optimum size and capacity equipment $13,491 $20,784 $10,145
220,537
kWh
$3,346
-
kW-mo/yr
-
TOTAL RECOMMENDED $108,515 $117,609 $49,701
915,314
kWh
$7,787
-
kW-mo/yr
$51,027
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs