| Assessment Year | 1990 |
|---|---|
| Principal Product | CORRUGATED CARTONS |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
n/a
|
| Annual Production | 505,000
thousand feet
|
| Production Hrs. Annual | 5,100
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $259,844 | 3,240,035 |
kWh
|
$0.080 |
| Natural Gas | $235,781 | 64,850 |
MMBtu
|
$3.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $57,334 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,341 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $12,333 | $500 | - |
$12,333
-
MMBtu
|
|
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $9,810 | $5,000 | - |
$9,810
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $7,708 | $7,800 | - |
$7,708
-
MMBtu
|
|
| 04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $548 | $275 | - |
$548
-
MMBtu
|
|
| 05 | 2.7494: Install storm windows and doors | $10,313 | $35,628 | - |
$10,313
-
MMBtu
|
|
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,350 | $2,100 | - |
$6,350
-
MMBtu
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $3,180 | $1,500 |
$3,180
39,566
kWh
|
- | |
| 08 | 2.2437: Recover waste heat from equipment | $2,219 | $3,000 | - |
$2,219
-
MMBtu
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $828 | $262 |
$828
10,258
kWh
|
- | |
| 10 | 2.6232: Install set-back timers | $573 | $200 |
$573
7,034
kWh
|
- | |
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,495 | - |
$1,495
18,757
kWh
|
- | |
| 12 | 2.4133: Use most efficient type of electric motors | $78 | $195 |
$78
879
kWh
|
- | |
| 13 | 2.7261: Install timers and/or thermostats | $1,400 | $260 | - |
$1,400
-
MMBtu
|
|
| 14 | 2.7226: Use computer programs to optimize hvac performance | $499 | $1,200 |
$499
6,155
kWh
|
- | |
| TOTAL RECOMMENDED | $57,334 | $57,920 |
$6,653
82,649
kWh
|
$50,681
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,341 | $2,262 |
$4,008
49,824
kWh
|
$12,333
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs