Assessment Year | 2020 |
---|---|
Principal Product | Architectural Millwork |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2431: Millwork |
Sales Range | $50 M to 100M |
# of Employees | 330 |
Plant Area |
800,000
ft2
|
Annual Production | 2,100
thousand feet
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $575,498 | 10,819,200 |
kWh
|
$0.053 | |
Electricity Demand | $417,916 | 31,926 |
kW-mo/yr
|
$13.09 | |
Electricity Fees | $2,400 | - |
|
- | |
Waste Disposal Costs | |||||
Water Disposal | $10,567 | 1,540 |
Tgal
|
$6.86 | |
TOTAL YEARLY COSTS | $1,006,381 | ||||
RECOMMENDED SAVINGS* | $57,122 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $38,471 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $3,141 | - |
$2,349
44,150
kWh
|
$792
-
kW-mo/yr
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,581 | $300 |
$3,509
65,961
kWh
|
$2,072
-
kW-mo/yr
|
|
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,015 | $2,880 |
$8,015
150,660
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,385 | $2,100 |
$5,385
101,223
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $1,682 | $945 |
$1,682
31,624
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,356 | $1,500 |
$1,482
27,850
kWh
|
$874
-
kW-mo/yr
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $1,109 | $1,524 |
$697
13,100
kWh
|
$412
-
kW-mo/yr
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,771 | $31,062 |
$7,399
139,085
kWh
|
$4,372
-
kW-mo/yr
|
|
09 | 2.4133: Use most efficient type of electric motors | $428 | $1,430 |
$269
5,050
kWh
|
$159
-
kW-mo/yr
|
|
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,654 | $60,600 |
$9,988
187,750
kWh
|
$7,666
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $57,122 | $102,341 |
$40,775
766,453
kWh
|
$16,347
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $38,471 | $94,986 |
$23,075
433,746
kWh
|
$15,396
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs