ITAC Assessment: WI0073
ITAC logo
ITAC Assessment: WI0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STAINLESS STEEL CASTINGS
NAICS
n/a
SIC 3324: Steel Investment Foundries
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $575,568 11,001,466
kWh
Natural Gas $154,847 43,395
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,899 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,333

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $6,497 $17,166 $6,497
-
kWh
-
02 2.4133: Use most efficient type of electric motors $208 $300 $208
4,103
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,614 $1,003 $1,614
30,774
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,828 - $1,828
34,877
kWh
-
05 2.6232: Install set-back timers $801 $400 $801
15,240
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $880 $1,000 $880
16,706
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $594 $800 - $594
-
MMBtu
08 2.7261: Install timers and/or thermostats $241 $250 - $241
-
MMBtu
09 2.3132: Recharge batteries on during off-peak demand periods $236 - $236
-
kWh
-
TOTAL RECOMMENDED $12,899 $20,919 $12,064
101,700
kWh
$835
-
MMBtu
TOTAL IMPLEMENTED $4,333 $3,503 $3,739
66,823
kWh
$594
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs