| Assessment Year | 2015 |
|---|---|
| Principal Product | Kitchen and bath cabinets |
| NAICS | 337110: Wood Kitchen Cabinet and Countertop Manufacturing |
| SIC | 2434: Wood Kitchen Cabinets |
| Sales Range | $5 M to 10M |
| # of Employees | 80 |
| Plant Area |
41,500
ft2
|
| Annual Production | 15,000
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Wyoming |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $46,152 | 695,203 |
kWh
|
$0.066 |
| Electricity Demand | $55,791 | 2,625 |
kW-mo/yr
|
$21.25 |
| Electricity Fees | $986 | - |
|
- |
| Natural Gas | $16,915 | 2,135 |
MMBtu
|
$7.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $43,320 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,720 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,710 | $28,880 |
$5,270
82,200
kWh
|
$2,440
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,510 | $1,200 |
$3,900
60,800
kWh
|
$3,610
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,400 | $1,670 |
$690
10,800
kWh
|
$710
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,210 | $57,920 |
$10,040
156,700
kWh
|
$11,480
-
kW-mo/yr
|
- | $2,570 | $1,120 | |
| 05 | 2.9111: Use solar heat to heat make-up air | $1,490 | $9,550 | - | - |
$1,490
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $43,320 | $99,220 |
$19,900
310,500
kWh
|
$18,240
-
kW-mo/yr
|
$1,490
-
MMBtu
|
$2,570 | $1,120 | ||
| TOTAL IMPLEMENTED | $32,720 | $59,120 |
$13,940
217,500
kWh
|
$15,090
-
kW-mo/yr
|
- | $2,570 | $1,120 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs