Assessment Year | 2014 |
---|---|
Principal Product | compact construction equipment |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
405,000
ft2
|
Annual Production | 46,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $751,712 | 11,815,579 |
kWh
|
$0.064 |
Electricity Demand | $331,140 | 25,953 |
kW-mo/yr
|
$12.76 |
Natural Gas | $502,679 | 81,651 |
MMBtu
|
$6.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $136,181 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $71,004 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $46,648 | $27,260 |
$33,659
529,227
kWh
|
$12,989
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $15,358 | $6,250 |
$11,084
174,283
kWh
|
$4,274
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $2,736 | $800 | - | - |
$2,736
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,050 | $225 |
$9,414
148,020
kWh
|
$3,636
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,680 | $3,200 |
$1,477
23,224
kWh
|
$3,203
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,680 | $5,175 |
$5,908
92,898
kWh
|
$12,772
-
kW-mo/yr
|
- | |
07 | 2.2442: Preheat combustion air with waste heat | $9,345 | $35,000 | - | - |
$9,345
-
MMBtu
|
|
08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $14,378 | $3,000 |
$14,378
226,067
kWh
|
- | - | |
09 | 2.1224: Replace boiler | $11,306 | $16,000 | - | - |
$11,306
-
MMBtu
|
|
TOTAL RECOMMENDED | $136,181 | $96,910 |
$75,920
1,193,719
kWh
|
$36,874
-
kW-mo/yr
|
$23,387
-
MMBtu
|
||
TOTAL IMPLEMENTED | $71,004 | $43,485 |
$43,073
677,247
kWh
|
$16,625
-
kW-mo/yr
|
$11,306
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs