ITAC Assessment: WM0051
ITAC logo
ITAC Assessment: WM0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product compact construction equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 405,000
ft2
Annual Production 46,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $751,712 11,815,579
kWh
Electricity Demand $331,140 25,953
kW-mo/yr
Natural Gas $502,679 81,651
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,181 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,004

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $46,648 $27,260 $33,659
529,227
kWh
$12,989
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $15,358 $6,250 $11,084
174,283
kWh
$4,274
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $2,736 $800 - - $2,736
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,050 $225 $9,414
148,020
kWh
$3,636
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,680 $3,200 $1,477
23,224
kWh
$3,203
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,680 $5,175 $5,908
92,898
kWh
$12,772
-
kW-mo/yr
-
07 2.2442: Preheat combustion air with waste heat $9,345 $35,000 - - $9,345
-
MMBtu
08 2.2614: Use cooling tower or economizer to replace chiller cooling $14,378 $3,000 $14,378
226,067
kWh
- -
09 2.1224: Replace boiler $11,306 $16,000 - - $11,306
-
MMBtu
TOTAL RECOMMENDED $136,181 $96,910 $75,920
1,193,719
kWh
$36,874
-
kW-mo/yr
$23,387
-
MMBtu
TOTAL IMPLEMENTED $71,004 $43,485 $43,073
677,247
kWh
$16,625
-
kW-mo/yr
$11,306
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs