ITAC Assessment: WI0065
ITAC logo
ITAC Assessment: WI0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product DISTILLED BOTTLED WATER
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 105
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,388 2,128,664
kWh
Natural Gas $74,912 15,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,902

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $51,883 $300,000 $79,306
1,274,912
kWh
$(-27,423.0)
-
MMBtu
02 2.7442: Keep doors and windows shut when not on use $11,109 $6,000 - $11,109
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $9,165 $15,000 - $9,165
-
MMBtu
04 2.2441: Preheat boiler makeup water with waste process heat $6,568 $8,000 - $6,568
-
MMBtu
05 2.7261: Install timers and/or thermostats $5,346 $750 - $5,346
-
MMBtu
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,916 - $2,916
-
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,143 $1,243 $1,143
18,464
kWh
-
08 2.4312: Improve lubrication practices $1,989 - $1,989
31,946
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $691 - $691
11,137
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $523 $750 $523
8,499
kWh
-
11 2.6218: Turn off equipment when not in use $500 $800 - $500
-
MMBtu
12 2.6232: Install set-back timers $317 $400 $317
4,982
kWh
-
TOTAL RECOMMENDED $92,150 $332,943 $86,885
1,349,940
kWh
$5,265
-
MMBtu
TOTAL IMPLEMENTED $12,902 $3,193 $7,056
66,529
kWh
$5,846
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs