ITAC Assessment: BS0070
ITAC logo
ITAC Assessment: BS0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Dried Milk Products
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $100
M
to 500
M
# of Employees 72
Plant Area 83,190
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $976,304 21,368,692
kWh
Electricity Demand $232,402 34,556
kW-mo/yr
Electricity Fees $5,884 -
Natural Gas $1,222,906 322,575
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.2113: Repair or replace steam traps $13,590 $12,584 - - $13,590
-
MMBtu
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,026 $744 $3,026
66,234
kWh
- - - -
03 2.8123: Pay utility bills on time $2,153 $213 - - - - $2,153
04 2.6124: Establish equipment maintenance schedule $1,079 $4,500 $1,079
23,622
kWh
- - - -
05 2.7224: Reduce space conditioning during non-working hours $418 $14 $325
7,117
kWh
- $93
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $220 $585 $193
4,233
kWh
$27
-
kW-mo/yr
- - -
07 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $161 $43 $161
3,533
kWh
- - - -
08 3.4157: Replace water cooling on processes with air cooling $9,918 $88,300 $398
8,720
kWh
- - $9,520
-
Tgal
-
TOTAL RECOMMENDED $30,565 $106,983 $5,182
113,459
kWh
$27
-
kW-mo/yr
$13,683
-
MMBtu
$9,520
-
Tgal
$2,153
TOTAL IMPLEMENTED $20,647 $18,683 $4,784
104,739
kWh
$27
-
kW-mo/yr
$13,683
-
MMBtu
- $2,153
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs