ITAC Assessment: TT0202
ITAC logo
ITAC Assessment: TT0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product metal can ends
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3466: Crowns and Closures
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 131,000
ft2
Annual Production 1,980,000,000
units
Production Hrs. Annual 8,208
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $282,310 4,628,075
kWh
Electricity Demand $97,531 8,877
kW-mo/yr
Natural Gas $7,679 1,193
MMBtu
Waste Disposal Costs
Water Usage $2,633 329
Tgal
Water Disposal $700 346
Tgal
TOTAL YEARLY COSTS $390,853
RECOMMENDED SAVINGS* $117,932 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,409

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $47,716 $83,867 $31,999
524,576
kWh
$9,473
-
kW-mo/yr
- $6,244
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $37,949 $3,000 $37,949
622,126
kWh
- - -
03 2.7135: Install occupancy sensors $16,093 $1,430 $16,093
263,831
kWh
- - -
04 2.4224: Upgrade controls on compressors $11,774 $40,000 $9,308
152,592
kWh
$2,466
-
kW-mo/yr
- -
05 2.7446: Utilize sensors controlling roof and wall openings $3,800 $1,200 $3,800
62,297
kWh
- - -
06 2.4151: Develop a repair/replace policy $403 $678 $216
3,548
kWh
$187
-
kW-mo/yr
- -
07 2.7261: Install timers and/or thermostats $197 $100 $156
2,563
kWh
- $41
-
MMBtu
-
TOTAL RECOMMENDED $117,932 $130,275 $99,521
1,631,533
kWh
$12,126
-
kW-mo/yr
$41
-
MMBtu
$6,244
TOTAL IMPLEMENTED $64,409 $86,075 $48,464
794,518
kWh
$9,660
-
kW-mo/yr
$41
-
MMBtu
$6,244
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs