ITAC Assessment: OR0259
ITAC logo
ITAC Assessment: OR0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product anodized aircraft components
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 30,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,725 1,632,181
kWh
Electricity Demand $7,721 4,691
kW-mo/yr
Natural Gas $19,387 3,647
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 3.1244: Reduce solution drag-out to prevent solution loss $7,505 - - - $682
-
lb
- $3,953 $2,870
02 2.6212: Turn off equipment during breaks, reduce operating time $584 - $584
19,637
kWh
- - - - -
03 2.2511: Insulate bare equipment $1,599 $1,436 $1,599
53,927
kWh
- - - - -
04 2.4133: Use most efficient type of electric motors $663 $1,454 $581
19,637
kWh
$82
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,337 $11,047 $1,199
40,445
kWh
$92
-
kW-mo/yr
- $108 $938 -
06 2.7111: Reduce illumination to minimum necessary levels $1,611 - $921
31,067
kWh
$34
-
kW-mo/yr
- $71 $585 -
TOTAL RECOMMENDED $14,299 $13,937 $4,884
164,713
kWh
$208
-
kW-mo/yr
$682
-
lb
$179 $5,476 $2,870
TOTAL IMPLEMENTED $11,962 $2,890 $3,685
124,268
kWh
$116
-
kW-mo/yr
$682
-
lb
$71 $4,538 $2,870
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs