ITAC Assessment: RU0038
ITAC logo
ITAC Assessment: RU0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FOLDING PAPER CARTONS
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area
n/a
Annual Production 19,693
ton
Production Hrs. Annual 6,240
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $321,773 6,291,911
kWh
Natural Gas $62,682 14,078
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,542 $2,386 $6,542
128,077
kWh
-
02 2.6232: Install set-back timers $6,581 - $6,581
128,957
kWh
-
03 2.4312: Improve lubrication practices $874 $1,600 $874
16,999
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,137 $72 $1,137
22,274
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,757 - $11,757
230,657
kWh
-
06 2.6218: Turn off equipment when not in use $4,115 - $4,115
80,598
kWh
-
07 2.4133: Use most efficient type of electric motors $3,864 $5,019 $3,864
75,909
kWh
-
08 2.6218: Turn off equipment when not in use $279 $800 $279
5,569
kWh
-
09 2.7243: Improve air circulation with destratification fans / other methods $3,548 $4,140 $(-279.0)
(-5,569)
kWh
$3,827
-
MMBtu
10 2.7261: Install timers and/or thermostats $3,707 $2,151 - $3,707
-
MMBtu
11 2.1233: Analyze flue gas for proper air/fuel ratio $3,536 $500 - $3,536
-
MMBtu
TOTAL RECOMMENDED $45,940 $16,668 $34,870
683,471
kWh
$11,070
-
MMBtu
TOTAL IMPLEMENTED $32,810 $3,686 $29,274
573,858
kWh
$3,536
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs