ITAC Assessment: RU0029
ITAC logo
ITAC Assessment: RU0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SMALL PLASTIC PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,364 1,954,865
kWh
Fuel Oil #2 $12,920 1,918
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $834 $322 $834
10,844
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $654 $202 $654
8,499
kWh
-
03 2.6232: Install set-back timers $1,898 - $1,898
24,326
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,940 - $1,940
24,912
kWh
-
05 2.7442: Keep doors and windows shut when not on use $933 - - $933
-
MMBtu
TOTAL RECOMMENDED $6,259 $524 $5,326
68,581
kWh
$933
-
MMBtu
TOTAL IMPLEMENTED $4,361 $524 $3,428
44,255
kWh
$933
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs