ITAC Assessment: MU0064
ITAC logo
ITAC Assessment: MU0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Bulk plastic and steel tubes for fuel and coolant applications
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 132
Plant Area 215,000
ft2
Annual Production 393,700
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $764,173 14,917,506
kWh
Electricity Demand $800,649 35,785
kW-mo/yr
Electricity Fees $67,546 -
Natural Gas $210,687 31,122
MMBtu
Other Energy $8,548 1
MMBtu
Waste Disposal Costs
Water Usage $31,585 5,766
Tgal
Water Disposal $34,012 5,766
Tgal
Other Liquid (non-haz) $352 1
gal
TOTAL YEARLY COSTS $1,917,552
RECOMMENDED SAVINGS* $171,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $6,486 $5,850 - - $6,486
-
MMBtu
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $25,072 $83,850 $4,552
91,041
kWh
$20,520
-
kW-mo/yr
- -
03 2.3132: Recharge batteries on during off-peak demand periods $21,996 $361 - $21,647
-
kW-mo/yr
- $349
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,419 - $8,563
171,252
kWh
$5,856
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $5,424 $305 $5,324
106,472
kWh
$101
-
kW-mo/yr
- -
06 2.4239: Eliminate or reduce compressed air usage $39,818 $496,424 $37,365
747,301
kWh
$2,453
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $11,750 $79,396 $6,573
131,460
kWh
$5,177
-
kW-mo/yr
- -
08 2.4322: Use or replace with energy efficient substitutes $3,961 $35,691 $3,715
74,294
kWh
$246
-
kW-mo/yr
- -
09 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $2,331 $1,688 $1,302
26,037
kWh
$1,029
-
kW-mo/yr
- -
10 2.6125: Keep equipment clean $1,393 - $779
15,579
kWh
$614
-
kW-mo/yr
- -
11 2.6218: Turn off equipment when not in use $495 - $277
5,538
kWh
$218
-
kW-mo/yr
- -
12 2.6232: Install set-back timers $35,464 $50,350 $4,510
90,201
kWh
$4,804
-
kW-mo/yr
$26,149
-
MMBtu
-
13 2.7135: Install occupancy sensors $751 $541 $409
8,176
kWh
$342
-
kW-mo/yr
- -
14 2.7224: Reduce space conditioning during non-working hours $137 - - - $137
-
MMBtu
-
15 2.7261: Install timers and/or thermostats $2,121 $1,483 $1,186
23,725
kWh
$935
-
kW-mo/yr
- -
16 2.7444: Close holes and openings in building such as broken windows $152 $753 - - $152
-
MMBtu
-
TOTAL RECOMMENDED $171,769 $756,692 $74,554
1,491,075
kWh
$63,943
-
kW-mo/yr
$32,924
-
MMBtu
$349
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs