ITAC Assessment: WI0424
ITAC logo
ITAC Assessment: WI0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Bone meal
NAICS
n/a
SIC 2077: Animal and Marine Fats and Oils
Sales Range $100
M
to 500
M
# of Employees 193
Plant Area 195,000
ft2
Annual Production 57,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $562,809 23,996,182
kWh
Electricity Demand $311,573 49,694
kW-mo/yr
Electricity Fees $21,918 -
Natural Gas $2,770,695 474,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $203,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $203,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 3.3132: Use reverse osmosis to concentrate material $177,300 - - - - $182,500
-
Tgal
$(-5,200.0)
02 2.2414: Use waste heat from hot flue gases to preheat $14,921 - - - $14,921
-
MMBtu
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,624 - $7,400
298,400
kWh
$2,224
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $1,745 - $871
35,100
kWh
$874
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $203,590 - $8,271
333,500
kWh
$3,098
-
kW-mo/yr
$14,921
-
MMBtu
$182,500
-
Tgal
$(-5,200.0)
TOTAL IMPLEMENTED $203,590 - $8,271
333,500
kWh
$3,098
-
kW-mo/yr
$14,921
-
MMBtu
$182,500
-
Tgal
$(-5,200.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs