Assessment Year | 1998 |
---|---|
Principal Product | Rotary Lawnmaower Blades |
NAICS |
n/a
|
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
40,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $130,725 | 4,009,672 |
kWh
|
$0.033 |
Electricity Demand | $69,153 | 11,172 |
kW-mo/yr
|
$6.19 |
Electricity Fees | $695 | - |
|
- |
Natural Gas | $44,308 | 8,343 |
MMBtu
|
$5.31 |
LPG | $4,925 | 231 |
MMBtu
|
$21.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $141,183 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,593 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,442 | $5,715 |
$1,848
55,979
kWh
|
$594
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,211 | $120 |
$973
29,601
kWh
|
$238
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.2511: Insulate bare equipment | $11,394 | $2,450 |
$11,394
345,252
kWh
|
- | - | - | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $25,208 | $74,000 |
$20,150
610,785
kWh
|
$18,199
-
kW-mo/yr
|
$(-13,141.0)
-
MMBtu
|
- | - | - | - | |
05 | 3.4151: Minimize water usage | $10,382 | $3,088 | - | - | - |
$7,843
-
Tgal
|
- | - |
$2,539
-
Tgal
|
|
06 | 4.211: Consider use / purchase of bulk materials where possible | $3,714 | $1,350 | - | - | - | - | - | $3,714 | - | |
07 | 4.445: Install equipment to move product | $86,832 | $45,000 | - | - | - | - | $86,832 | - | - | |
TOTAL RECOMMENDED | $141,183 | $131,723 |
$34,365
1,041,617
kWh
|
$19,031
-
kW-mo/yr
|
$(-13,141.0)
-
MMBtu
|
$7,843
-
Tgal
|
$86,832 | $3,714 |
$2,539
-
Tgal
|
||
TOTAL IMPLEMENTED | $11,593 | $3,208 |
$973
29,601
kWh
|
$238
-
kW-mo/yr
|
- |
$7,843
-
Tgal
|
- | - |
$2,539
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs