ITAC Assessment: DS0125
ITAC logo
ITAC Assessment: DS0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Rotary Lawnmaower Blades
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 40,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,725 4,009,672
kWh
Electricity Demand $69,153 11,172
kW-mo/yr
Electricity Fees $695 -
Natural Gas $44,308 8,343
MMBtu
LPG $4,925 231
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,593

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,442 $5,715 $1,848
55,979
kWh
$594
-
kW-mo/yr
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,211 $120 $973
29,601
kWh
$238
-
kW-mo/yr
- - - - -
03 2.2511: Insulate bare equipment $11,394 $2,450 $11,394
345,252
kWh
- - - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,208 $74,000 $20,150
610,785
kWh
$18,199
-
kW-mo/yr
$(-13,141.0)
-
MMBtu
- - - -
05 3.4151: Minimize water usage $10,382 $3,088 - - - $7,843
-
Tgal
- - $2,539
-
Tgal
06 4.211: Consider use / purchase of bulk materials where possible $3,714 $1,350 - - - - - $3,714 -
07 4.445: Install equipment to move product $86,832 $45,000 - - - - $86,832 - -
TOTAL RECOMMENDED $141,183 $131,723 $34,365
1,041,617
kWh
$19,031
-
kW-mo/yr
$(-13,141.0)
-
MMBtu
$7,843
-
Tgal
$86,832 $3,714 $2,539
-
Tgal
TOTAL IMPLEMENTED $11,593 $3,208 $973
29,601
kWh
$238
-
kW-mo/yr
- $7,843
-
Tgal
- - $2,539
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs