ITAC Assessment: KU0018
ITAC logo
ITAC Assessment: KU0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1981
Principal Product HEALTH CARE
NAICS
n/a
SIC 3641: Electric Lamp Bulbs and Tubes
Sales Range $1
M
to 5
M
# of Employees 62
Plant Area
n/a
Annual Production 107
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,678 263,775
kWh
Natural Gas $9,816 3,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,216

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,659 - $2,659
60,082
kWh
-
02 2.7212: Install or upgrade insulation on hvac distribution systems $1,039 $1,600 $623
14,068
kWh
$416
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $495 - $291
6,448
kWh
$204
-
MMBtu
04 2.7492: Use proper thickness of insulation on building envelope $518 $1,020 $88
2,052
kWh
$430
-
MMBtu
TOTAL RECOMMENDED $4,711 $2,620 $3,661
82,650
kWh
$1,050
-
MMBtu
TOTAL IMPLEMENTED $4,216 $2,620 $3,370
76,202
kWh
$846
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs