Assessment Year | 2024 |
---|---|
Principal Product | Boats, small boat components |
NAICS | 336612: Boat Building |
SIC | 3732: Boat Building and Repairing |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
157,000
ft2
|
Annual Production | 1,500
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $58,324 | 1,592,659 |
kWh
|
$0.037 | |
Electricity Demand | $173,990 | 5,502 |
kW-mo/yr
|
$31.62 | |
Electricity Fees | $27,762 | - |
|
- | |
Natural Gas | $80,882 | 34,612 |
MMBtu
|
$2.34 | |
Waste Disposal Costs | |||||
Water Usage | $3,751 | 484 |
Tgal
|
$7.75 | |
TOTAL YEARLY COSTS | $344,709 | ||||
RECOMMENDED SAVINGS* | $130,666 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $5,152 | $9,744 | - | - | $5,152 | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,143 | $109,752 |
$(-8,650.1)
(-216,253)
kWh
|
- | - |
$29,794
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,582 | $6,438 |
$1,631
40,767
kWh
|
$5,951
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,514 | $2,370 |
$541
13,516
kWh
|
$1,973
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,409 | - |
$537
13,431
kWh
|
$1,872
-
kW-mo/yr
|
- | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $19,524 | $98,469 |
$419
10,481
kWh
|
$5,850
-
kW-mo/yr
|
- |
$6,555
-
MMBtu
|
$6,700 | |
07 | 2.6218: Turn off equipment when not in use | $22 | $66 |
$3
83
kWh
|
$19
-
kW-mo/yr
|
- | - | - | |
08 | 2.6218: Turn off equipment when not in use | $603 | - |
$290
7,253
kWh
|
$313
-
kW-mo/yr
|
- | - | - | |
09 | 2.6232: Install set-back timers | $41,716 | $119,375 |
$2,792
69,799
kWh
|
$25,815
-
kW-mo/yr
|
- |
$13,109
-
MMBtu
|
- | |
10 | 2.7111: Reduce illumination to minimum necessary levels | $1,056 | - |
$227
5,678
kWh
|
$828
-
kW-mo/yr
|
- | - | - | |
11 | 2.7135: Install occupancy sensors | $2,868 | $2,604 |
$617
15,435
kWh
|
$2,251
-
kW-mo/yr
|
- | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $292 | $800 |
$140
3,504
kWh
|
$152
-
kW-mo/yr
|
- | - | - | |
13 | 2.7224: Reduce space conditioning during non-working hours | $5,114 | - |
$1,075
26,884
kWh
|
$3,923
-
kW-mo/yr
|
- |
$115
-
MMBtu
|
- | |
14 | 2.7261: Install timers and/or thermostats | $61 | $264 | - | - | - |
$61
-
MMBtu
|
- | |
15 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $10,501 | $29,043 | - | - | - |
$10,501
-
MMBtu
|
- | |
16 | 2.7444: Close holes and openings in building such as broken windows | $72 | $174 | - | - | - |
$72
-
MMBtu
|
- | |
17 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,296 | $25,585 |
$(-145.9)
(-3,648)
kWh
|
$(-480.6)
-
kW-mo/yr
|
- |
$4,922
-
MMBtu
|
- | |
18 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $589 | $1,046 | - | - | - |
$589
-
MMBtu
|
- | |
19 | 2.8121: Apply for tax-free status for energy purchases | $5,152 | - | - | - | $5,152 | - | - | |
TOTAL RECOMMENDED | $130,666 | $405,730 |
$(-523.1)
(-13,069)
kWh
|
$48,466
-
kW-mo/yr
|
$10,304 |
$65,719
-
MMBtu
|
$6,700 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs