ITAC Assessment: MO0206
ITAC logo
ITAC Assessment: MO0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Custom Vinyl Packaging
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 65,000
ft2
Annual Production 26,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,349 3,009,965
kWh
Electricity Demand $19,738 1,134
kW-mo/yr
Electricity Fees $24,159 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $26,790 $30,000 - - - - $26,790
02 4.432: Cross-train personnel to avoid lost time $5,675 $15,000 - - - - $5,675
03 4.514: Re-arrange equipment layout to reduce handling costs $4,225 $10,000 - - - - $4,225
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,491 $14,160 $7,092
124,560
kWh
$399
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,095 $1,346 $1,024
17,878
kWh
$71
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $119 $207 $115
2,052
kWh
$4
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $1,762 $232 $1,605
28,136
kWh
$157
-
kW-mo/yr
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $3,254 $160 $2,963
51,876
kWh
$291
-
kW-mo/yr
- - -
09 2.4131: Size electric motors for peak operating efficiency $1,210 $1,974 $1,142
19,930
kWh
$68
-
kW-mo/yr
- - -
10 3.5311: Recover and reuse waste material $5,619 - - - - $5,619
-
lb
-
11 3.8136: Switch to a solvent that can be cleaned and re-used $480 - - - $480
-
gal
- -
TOTAL RECOMMENDED $57,720 $73,079 $13,941
244,432
kWh
$990
-
kW-mo/yr
$480
-
gal
$5,619
-
lb
$36,690
TOTAL IMPLEMENTED $57,240 $73,079 $13,941
244,432
kWh
$990
-
kW-mo/yr
- $5,619
-
lb
$36,690
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs