ITAC Assessment: UD0484
ITAC logo
ITAC Assessment: UD0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product fabricated plate work, metal stampings
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 40,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 5,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,257 3,743,845
kWh
Electricity Demand $123,231 10,176
kW-mo/yr
Natural Gas $33,681 7,306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,495

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $4,104 $4,000 - $4,104
-
kW-mo/yr
- - -
02 3.4116: Meter recycled water (to reduce sewer charges) $60,000 - - - - $60,000
-
gal
-
03 2.4226: Use / purchase optimum sized compressor $5,391 $(-30,000.0) $3,171
150,938
kWh
- $(-1,230.0)
-
MMBtu
- $3,450
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,627 $2,700 $544
25,791
kWh
$1,083
-
kW-mo/yr
- - -
05 2.7111: Reduce illumination to minimum necessary levels $1,744 $4,000 $671
31,946
kWh
$1,073
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,582 $2,704 $591
28,136
kWh
$991
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $74,448 $(-16,596.0) $4,977
236,811
kWh
$7,251
-
kW-mo/yr
$(-1,230.0)
-
MMBtu
$60,000
-
gal
$3,450
TOTAL IMPLEMENTED $9,495 $(-26,000.0) $3,171
150,938
kWh
$4,104
-
kW-mo/yr
$(-1,230.0)
-
MMBtu
- $3,450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs