Assessment Year | 1996 |
---|---|
Principal Product | fabricated plate work, metal stampings |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
40,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 5,600
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,257 | 3,743,845 |
kWh
|
$0.031 |
Electricity Demand | $123,231 | 10,176 |
kW-mo/yr
|
$12.11 |
Natural Gas | $33,681 | 7,306 |
MMBtu
|
$4.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,495 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $4,104 | $4,000 | - |
$4,104
-
kW-mo/yr
|
- | - | - | |
02 | 3.4116: Meter recycled water (to reduce sewer charges) | $60,000 | - | - | - | - |
$60,000
-
gal
|
- | |
03 | 2.4226: Use / purchase optimum sized compressor | $5,391 | $(-30,000.0) |
$3,171
150,938
kWh
|
- |
$(-1,230.0)
-
MMBtu
|
- | $3,450 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,627 | $2,700 |
$544
25,791
kWh
|
$1,083
-
kW-mo/yr
|
- | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,744 | $4,000 |
$671
31,946
kWh
|
$1,073
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,582 | $2,704 |
$591
28,136
kWh
|
$991
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $74,448 | $(-16,596.0) |
$4,977
236,811
kWh
|
$7,251
-
kW-mo/yr
|
$(-1,230.0)
-
MMBtu
|
$60,000
-
gal
|
$3,450 | ||
TOTAL IMPLEMENTED | $9,495 | $(-26,000.0) |
$3,171
150,938
kWh
|
$4,104
-
kW-mo/yr
|
$(-1,230.0)
-
MMBtu
|
- | $3,450 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs