ITAC Assessment: NC0266
ITAC logo
ITAC Assessment: NC0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Paperboard boxes
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 102,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,583 5,393,312
kWh
Electricity Demand $121,319 12,930
kW-mo/yr
Electricity Fees $5,033 -
Natural Gas $28,739 3,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7313: Recycle air for heating, ventilation and air conditioning $15,154 $11,606 $1,398
50,836
kWh
- $13,756
-
MMBtu
- -
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,628 $4,597 $1,835
66,738
kWh
$793
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $1,941 $2,157 $957
34,804
kWh
$984
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $604 $300 $1,082
39,361
kWh
$742
-
kW-mo/yr
- $(-800.0) $(-420.0)
05 2.2437: Recover waste heat from equipment $1,833 $1,189 - - $1,833
-
MMBtu
- -
06 2.2511: Insulate bare equipment $61 $132 $36
1,302
kWh
$25
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $744 $1,456 $444
16,128
kWh
$300
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $22,965 $21,437 $5,752
209,169
kWh
$2,844
-
kW-mo/yr
$15,589
-
MMBtu
$(-800.0) $(-420.0)
TOTAL IMPLEMENTED $7,811 $9,831 $4,354
158,333
kWh
$2,844
-
kW-mo/yr
$1,833
-
MMBtu
$(-800.0) $(-420.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs