ITAC Assessment: KU0453
ITAC logo
ITAC Assessment: KU0453
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product solid wood cabinet doors
NAICS
n/a
SIC 2431: Millwork
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 42,582
ft2
Annual Production 325,090
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,871 809,496
kWh
Natural Gas $11,719 2,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,843 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $2,320 $17,800 - $2,320
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,625 $4,257 $1,143
21,102
kWh
- $482
03 2.7142: Utilize higher efficiency lamps and/or ballasts $559 $1,920 $413
7,620
kWh
- $146
04 2.7135: Install occupancy sensors $270 $350 $270
4,982
kWh
- -
05 2.4133: Use most efficient type of electric motors $939 $1,922 $939
17,292
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $350 $79 $350
6,448
kWh
- -
07 2.7261: Install timers and/or thermostats $652 $600 $79
1,465
kWh
$573
-
MMBtu
-
08 2.6231: Utilize controls to operate equipment only when needed $349 $95 $349
6,448
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $365 $340 $365
6,741
kWh
- -
10 2.7447: Install vinyl strip / high speed / air curtain doors $414 $138 - $414
-
MMBtu
-
TOTAL RECOMMENDED $7,843 $27,501 $3,908
72,098
kWh
$3,307
-
MMBtu
$628
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs