ITAC Assessment: KU0098
ITAC logo
ITAC Assessment: KU0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product CARDBOARD MILK CONTAINER
NAICS
n/a
SIC 2656: Sanitary Food Containers, Except Folding
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 30,000
ton
Production Hrs. Annual 4,128
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,283 2,822,392
kWh
Natural Gas $118,464 30,383
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,556 $8,044 $8,556
139,215
kWh
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,062 $371 - $1,062
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $2,886 $162 $234
3,810
kWh
$2,652
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $615 $300 - $615
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $580 $510 - $580
-
MMBtu
-
06 2.1123: Install automatic stack damper $1,331 $1,700 - $1,331
-
MMBtu
-
07 2.6214: Shut off pilots in standby equipment $2,452 $300 - $2,752
-
MMBtu
$(-300.0)
08 2.7229: Air condition only space necessary $4,385 - - $4,385
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $360 $252 $360
5,862
kWh
- -
10 2.7226: Use computer programs to optimize hvac performance $6,750 $7,400 $6,750
109,906
kWh
- -
11 2.7111: Reduce illumination to minimum necessary levels $3,711 - $3,711
37,222
kWh
- -
12 2.6232: Install set-back timers $2,264 - $2,264
21,395
kWh
- -
TOTAL RECOMMENDED $34,952 $19,039 $21,875
317,410
kWh
$13,377
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $1,062 $371 - $1,062
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs