Assessment Year | 1991 |
---|---|
Principal Product | BAKERY SUPPLIES |
NAICS |
n/a
|
SIC | 2045: Prepared Flour Mixes and Doughs |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 6,448
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,695 | 1,507,327 |
kWh
|
$0.058 |
Natural Gas | $34,800 | 8,790 |
MMBtu
|
$3.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,515 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,515 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $7,760 | $250 |
$5,600
-
kWh
|
$2,160
-
MMBtu
|
- | |
02 | 2.7314: Reduce ventilation air | $2,000 | $1,800 | - |
$2,000
-
MMBtu
|
- | |
03 | 2.7261: Install timers and/or thermostats | $3,900 | $6,200 | - |
$3,900
-
MMBtu
|
- | |
04 | 2.6218: Turn off equipment when not in use | $2,100 | $800 | - |
$2,100
-
MMBtu
|
- | |
05 | 2.6232: Install set-back timers | $3,460 | $800 |
$3,460
132,767
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,844 | $1,824 |
$3,844
65,944
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $801 | $2,040 |
$801
13,775
kWh
|
- | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,300 | - | - |
$3,800
-
MMBtu
|
$(-500.0) | |
09 | 2.4221: Install compressor air intakes in coolest locations | $1,200 | $1,000 |
$1,200
20,809
kWh
|
- | - | |
10 | 2.2511: Insulate bare equipment | $1,110 | $1,180 | - |
$1,110
-
MMBtu
|
- | |
11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,130 | $400 | - |
$1,130
-
MMBtu
|
- | |
12 | 2.6212: Turn off equipment during breaks, reduce operating time | $860 | $200 |
$860
14,947
kWh
|
- | - | |
13 | 2.3132: Recharge batteries on during off-peak demand periods | $590 | $300 |
$590
-
kWh
|
- | - | |
14 | 2.7447: Install vinyl strip / high speed / air curtain doors | $460 | $1,200 | - |
$460
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $32,515 | $17,994 |
$16,355
248,242
kWh
|
$16,660
-
MMBtu
|
$(-500.0) | ||
TOTAL IMPLEMENTED | $32,515 | $17,994 |
$16,355
248,242
kWh
|
$16,660
-
MMBtu
|
$(-500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs