ITAC Assessment: CO0210
ITAC logo
ITAC Assessment: CO0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BAKERY SUPPLIES
NAICS
n/a
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 50,000,000
lb
Production Hrs. Annual 6,448
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,695 1,507,327
kWh
Natural Gas $34,800 8,790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $7,760 $250 $5,600
-
kWh
$2,160
-
MMBtu
-
02 2.7314: Reduce ventilation air $2,000 $1,800 - $2,000
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $3,900 $6,200 - $3,900
-
MMBtu
-
04 2.6218: Turn off equipment when not in use $2,100 $800 - $2,100
-
MMBtu
-
05 2.6232: Install set-back timers $3,460 $800 $3,460
132,767
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,844 $1,824 $3,844
65,944
kWh
- -
07 2.4133: Use most efficient type of electric motors $801 $2,040 $801
13,775
kWh
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $3,300 - - $3,800
-
MMBtu
$(-500.0)
09 2.4221: Install compressor air intakes in coolest locations $1,200 $1,000 $1,200
20,809
kWh
- -
10 2.2511: Insulate bare equipment $1,110 $1,180 - $1,110
-
MMBtu
-
11 2.7447: Install vinyl strip / high speed / air curtain doors $1,130 $400 - $1,130
-
MMBtu
-
12 2.6212: Turn off equipment during breaks, reduce operating time $860 $200 $860
14,947
kWh
- -
13 2.3132: Recharge batteries on during off-peak demand periods $590 $300 $590
-
kWh
- -
14 2.7447: Install vinyl strip / high speed / air curtain doors $460 $1,200 - $460
-
MMBtu
-
TOTAL RECOMMENDED $32,515 $17,994 $16,355
248,242
kWh
$16,660
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $32,515 $17,994 $16,355
248,242
kWh
$16,660
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs