ITAC Assessment: AM0067
ITAC logo
ITAC Assessment: AM0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STONE-WASHED JEANS
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 7,000,000
pieces
Production Hrs. Annual 7,292
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,958 4,470,985
kWh
Natural Gas $337,134 122,259
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,172

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $28,911 $6,400 $28,911
-
kWh
- -
02 2.2135: Repair and eliminate steam leaks $4,380 $800 - $4,380
-
MMBtu
-
03 2.6232: Install set-back timers $3,860 - $3,860
57,737
kWh
- -
04 3.4154: Eliminate leaks in water lines and valves $2,932 $175 - $700
-
MMBtu
$2,232
06 2.4221: Install compressor air intakes in coolest locations $900 $800 $900
20,516
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $154 $91 $154
2,345
kWh
- -
08 2.7261: Install timers and/or thermostats $285 $83 $105
2,345
kWh
$180
-
MMBtu
-
09 2.8118: Check for accuracy of utility / power meters $94 $500 - - $94
TOTAL RECOMMENDED $41,516 $8,849 $33,930
82,943
kWh
$5,260
-
MMBtu
$2,326
TOTAL IMPLEMENTED $11,172 $975 $3,860
57,737
kWh
$5,080
-
MMBtu
$2,232
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs