ITAC Assessment: UD0473
ITAC logo
ITAC Assessment: UD0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product master cylinder and brake pistons
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 40,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,646 1,672,333
kWh
Natural Gas $70,283 26,712
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,965

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $2,965 $8,000 $2,965
109,906
kWh
-
02 2.2437: Recover waste heat from equipment $1,762 $2,500 - $1,762
-
MMBtu
03 2.2424: Use heat in flue gases to preheat products or materials $5,523 $7,500 - $5,523
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,330 $18,955 $14,330
255,276
kWh
-
TOTAL RECOMMENDED $24,580 $36,955 $17,295
365,182
kWh
$7,285
-
MMBtu
TOTAL IMPLEMENTED $2,965 $8,000 $2,965
109,906
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs