ITAC Assessment: UK1510
ITAC logo
ITAC Assessment: UK1510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Fire Turnout Gear
NAICS 315220: Men’s and Boys’ Cut and Sew Apparel Manufacturing
SIC 2326: Men's and Boys' Work Clothing
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 240,000
ft2
Annual Production 321,250
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,088 694,848
kWh
Electricity Demand $18,388 2,438
kW-mo/yr
Electricity Fees $7,520 -
Natural Gas $42,072 2,855
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,621

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4224: Upgrade controls on compressors $10,047 $6,250 $8,494
128,691
kWh
$1,553
-
kW-mo/yr
- -
02 2.7134: Use photocell controls $3,354 $750 $3,354
50,812
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,580 $2,360 $870
13,175
kWh
$135
-
kW-mo/yr
- $1,575
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,187 $2,890 $1,667
25,247
kWh
$520
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,527 $2,143 $1,241
18,796
kWh
$264
-
kW-mo/yr
- $22
06 2.6218: Turn off equipment when not in use $1,236 - $1,236
18,720
kWh
- - -
07 2.7111: Reduce illumination to minimum necessary levels $849 - $849
12,849
kWh
- - -
08 2.4152: Use only certified motor repair shops $623 $2,031 $623
9,435
kWh
- - -
09 2.4221: Install compressor air intakes in coolest locations $445 $650 $445
6,740
kWh
- - -
10 2.1131: Repair faulty insulation in furnaces, boilers, etc $305 $886 $305
4,617
kWh
- - -
11 2.7491: Insulate glazing, walls, ceilings, and roofs $427 $273 - - $427
-
MMBtu
-
12 2.7442: Keep doors and windows shut when not on use $310 $90 - - $310
-
MMBtu
-
TOTAL RECOMMENDED $23,890 $18,323 $19,084
289,082
kWh
$2,472
-
kW-mo/yr
$737
-
MMBtu
$1,597
TOTAL IMPLEMENTED $11,621 $8,506 $8,368
126,750
kWh
$919
-
kW-mo/yr
$737
-
MMBtu
$1,597
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs