ITAC Assessment: UD0376
ITAC logo
ITAC Assessment: UD0376
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product INJECTION-MOLDED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $584,734 13,381,008
kWh
Natural Gas $77,446 21,197
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,315 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,194

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,478 - $2,478
-
kWh
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,160 - $14,160
-
kWh
03 2.6232: Install set-back timers $556 - $556
25,498
kWh
04 2.6232: Install set-back timers $7,731 - $7,731
193,728
kWh
05 2.3191: Use demand controller or load shedder $12,390 $30,000 $12,390
-
kWh
TOTAL RECOMMENDED $37,315 $30,000 $37,315
219,226
kWh
TOTAL IMPLEMENTED $17,194 - $17,194
25,498
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs