ITAC Assessment: UF0586
ITAC logo
ITAC Assessment: UF0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Printing Products and Flexible Packaging
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 43,500
ft2
Annual Production 61,673,991
units
Production Hrs. Annual 5,928
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,712 1,228,164
kWh
Electricity Demand $48,079 4,225
kW-mo/yr
Electricity Fees $13,530 -
Waste Disposal Costs
Water Usage $360 728
Tgal
Water Disposal $1,495 357
Tgal
Other Liquid (haz) $7,095 52,670
gal
Solid Waste (non-haz) $272,892 205,132,411
lb
TOTAL YEARLY COSTS $427,163
RECOMMENDED SAVINGS* $155,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.9114: Use solar heat to make electricty $86,172 $297,040 $42,473
624,597
kWh
$43,699
-
kW-mo/yr
-
02 2.7243: Improve air circulation with destratification fans / other methods $23,066 $12,420 $(-1,415.0)
(-20,811)
kWh
$(-479.0)
-
kW-mo/yr
$24,960
03 2.3191: Use demand controller or load shedder $9,260 $6,608 $5,846
85,971
kWh
$3,414
-
kW-mo/yr
-
04 2.6231: Utilize controls to operate equipment only when needed $6,260 $25,400 $6,260
92,055
kWh
- -
05 2.4133: Use most efficient type of electric motors $5,306 $9,876 $2,575
37,872
kWh
$2,731
-
kW-mo/yr
-
06 4.424: Improve space comfort conditioning $24,960 $4,480 - - $24,960
TOTAL RECOMMENDED $155,024 $355,824 $55,739
819,684
kWh
$49,365
-
kW-mo/yr
$49,920
TOTAL IMPLEMENTED $59,592 $52,176 $7,420
109,116
kWh
$2,252
-
kW-mo/yr
$49,920
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs