Assessment Year | 2025 |
---|---|
Principal Product | Pancreatin Powder |
NAICS | 325414: Biological Product (except Diagnostic) Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
104,075
ft2
|
Annual Production | 200
units
|
Production Hrs. Annual | 2,625
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $221,050 | 3,665,760 |
kWh
|
$0.060 | |
Electricity Demand | $62,890 | 8,583 |
kW-mo/yr
|
$7.33 | |
Electricity Fees | $16,309 | - |
|
- | |
Natural Gas | $146,044 | 27,858 |
MMBtu
|
$5.24 | |
Other Gas | $20,069 | 1 |
MMBtu
|
$20,069.00 | |
Waste Disposal Costs | |||||
Water Usage | $18,631 | 6,647 |
Tgal
|
$2.80 | |
Water Disposal | $56,128 | 6,647 |
Tgal
|
$8.44 | |
Other Liquid (non-haz) | $16,522 | 1 |
gal
|
$16,522.00 | |
TOTAL YEARLY COSTS | $557,643 | ||||
RECOMMENDED SAVINGS* | $55,806 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Water Usage Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2113: Repair or replace steam traps | $25,413 | $2,500 | - | - |
$29,413
-
MMBtu
|
- | - | - | - | $(-4,000.0) | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $14,105 | $5,658 |
$(-48.0)
(-803)
kWh
|
$(-75.0)
-
kW-mo/yr
|
$478
-
MMBtu
|
- | - | - | - | $13,750 | - | |
03 | 2.8121: Apply for tax-free status for energy purchases | $13,231 | $400 | - | - | - |
$8,539
-
MMBtu
|
- | - |
$4,692
-
gal
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,502 | $3,500 |
$3,402
56,700
kWh
|
- | - | - | - | - | - | $(-800.0) | $(-100.0) | |
05 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $555 | $3,479 | - | - |
$441
-
MMBtu
|
- |
$28
-
Tgal
|
$86
-
Tgal
|
- | - | - | |
TOTAL RECOMMENDED | $55,806 | $15,537 |
$3,354
55,897
kWh
|
$(-75.0)
-
kW-mo/yr
|
$30,332
-
MMBtu
|
$8,539
-
MMBtu
|
$28
-
Tgal
|
$86
-
Tgal
|
$4,692
-
gal
|
$8,950 | $(-100.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs