ITAC Assessment: NL0119
ITAC logo
ITAC Assessment: NL0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Pancreatin Powder
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 104,075
ft2
Annual Production 200
units
Production Hrs. Annual 2,625
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,050 3,665,760
kWh
Electricity Demand $62,890 8,583
kW-mo/yr
Electricity Fees $16,309 -
Natural Gas $146,044 27,858
MMBtu
Other Gas $20,069 1
MMBtu
Waste Disposal Costs
Water Usage $18,631 6,647
Tgal
Water Disposal $56,128 6,647
Tgal
Other Liquid (non-haz) $16,522 1
gal
TOTAL YEARLY COSTS $557,643
RECOMMENDED SAVINGS* $55,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2113: Repair or replace steam traps $25,413 $2,500 - - $29,413
-
MMBtu
- - - - $(-4,000.0) -
02 2.7243: Improve air circulation with destratification fans / other methods $14,105 $5,658 $(-48.0)
(-803)
kWh
$(-75.0)
-
kW-mo/yr
$478
-
MMBtu
- - - - $13,750 -
03 2.8121: Apply for tax-free status for energy purchases $13,231 $400 - - - $8,539
-
MMBtu
- - $4,692
-
gal
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,502 $3,500 $3,402
56,700
kWh
- - - - - - $(-800.0) $(-100.0)
05 2.1242: Minimize boiler blowdown with better feedwater treatment $555 $3,479 - - $441
-
MMBtu
- $28
-
Tgal
$86
-
Tgal
- - -
TOTAL RECOMMENDED $55,806 $15,537 $3,354
55,897
kWh
$(-75.0)
-
kW-mo/yr
$30,332
-
MMBtu
$8,539
-
MMBtu
$28
-
Tgal
$86
-
Tgal
$4,692
-
gal
$8,950 $(-100.0)
TOTAL IMPLEMENTED - - - - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs