ITAC Assessment: IA0412
ITAC logo
ITAC Assessment: IA0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aluminum Castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 81
Plant Area 100,000
ft2
Annual Production 3,200,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,031 4,275,900
kWh
Electricity Demand $111,786 11,316
kW-mo/yr
Natural Gas $436,879 55,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $196,793 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $155,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,810 $1,864 $1,267
34,548
kWh
$543
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,305 $2,775 $757
20,640
kWh
$548
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $671 $1,925 $671
17,771
kWh
- - - -
04 2.2514: Cover open tanks $143,500 $22,000 $67,900
1,852,000
kWh
$20,000
-
kW-mo/yr
$55,600
-
MMBtu
- -
05 2.2511: Insulate bare equipment $164 $200 - - $164
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,034 $500 $4,928
134,280
kWh
$2,106
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $1,880 $104 $1,097
29,863
kWh
$783
-
kW-mo/yr
- - -
08 2.1116: Improve combustion control capability $6,996 $500 - - $6,996
-
MMBtu
- -
09 3.1192: Reduce scrap production $33,433 $4,000 $167
4,488
kWh
$209
-
kW-mo/yr
- $11,832 $21,225
TOTAL RECOMMENDED $196,793 $33,868 $76,787
2,093,590
kWh
$24,189
-
kW-mo/yr
$62,760
-
MMBtu
$11,832 $21,225
TOTAL IMPLEMENTED $155,693 $27,443 $75,949
2,071,331
kWh
$23,980
-
kW-mo/yr
$55,764
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings