Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,785

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0046 #05 Y:2025 Install set-back timers $1,557 -
NT0046 #04 Y:2025 Clean or color roof to reduce solar load $3,341 $6,080
NT0046 #03 Y:2025 Insulate bare equipment $1,581 $9,420
NT0046 #02 Y:2025 Purchase equipment instead of leasing $13,917 $55,150
NT0046 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $9,383 $5,609
NT0045 #06 Y:2025 Begin a practice of predictive / preventative maintenance $150,000 $9,690
NT0045 #05 Y:2025 Train operators for maximum operating efficiency $150,000 $100,000
NT0045 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $65,667 $138,252
NT0045 #03 Y:2025 Lower temperature during the winter season and vice-versa $724 $950
NT0045 #02 Y:2025 Upgrade controls on compressors $13,920 $30,800
NT0045 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $6,253 $5,609
AM0955 #04 Y:2025 Use solar heat to make electricty $12,041 $229,320
AM0955 #03 Y:2025 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,639 $69,318
AM0955 #02 Y:2025 Install occupancy sensors $485 $1,668
AM0955 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $349 $1,474
NT0044 #05 Y:2025 Apply for tax-free status for energy purchases $31,678 $5,000
NT0044 #04 Y:2025 Optimize plant power factor $3,340 $18,058
NT0044 #03 Y:2025 Install equipment to move product $150,000 $182,000
NT0044 #02 Y:2025 Install set-back timers $1,025 $785
NT0044 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,097 $5,753